The railway facilities of the Chemin de fer Arnaud connect the Arnaud junction to the Port of Pointe-Noire facilities. This railway spans over 34 km long and allows various mining companies to send their ore to the port facilities. The mandates consisted in making modifications and repairs to the existing facilities.

Client’s name
Consolidated Thompson
Total cost of the project
1 M$
Project delivery methods
Engineering Procurement – Construction Management (EPCM)
Region
Sept-Iles, Pointe-Noire

Nature of the project

  • Inspection
  • Study and analysis
  • Preliminary and final designs
  • Construction management
  • Monitoring services
  • Quality control and assurance
    Inspection during the construction phase
    Environmental monitoring
  • – Commissioning

Specificities of the project

  • Inspection and repair of the railway bridge
  • Addition and replacement of railway
  • Study for the addition of a 13-km side track
  • Study on access to the Port of Sept-Îles

Similar projects